GB/T 19773-2005 变压吸附提纯氢系统技术要求

GB/T 19773-2005 Specification of hydrogen purification system on pressure swing adsorption

国家标准 中文简体 现行 页数:18页 | 格式:PDF

基本信息

标准号
GB/T 19773-2005
相关服务
标准类型
国家标准
标准状态
现行
中国标准分类号(CCS)
国际标准分类号(ICS)
发布日期
2005-05-25
实施日期
2005-11-01
发布单位/组织
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会
归口单位
全国能源基础与管理标准化技术委员会(SAC/TC 20)
适用范围
-

发布历史

研制信息

起草单位:
中国标准化研究院、清华大学核能与新能源技术研究院、西南化工研究设计院、中国电子工程设计院
起草人:
汤洪、毛宗强、贾铁鹰、陈霖新、袁柏燕、奚树人、孟培勤、侯士杰、郭建富、宋刚祥、吴素娟
出版信息:
页数:18页 | 字数:32 千字 | 开本: 大16开

内容描述

ICS27.180

F19

中华人民共和国国家标准

GB/T19773-2005

变压吸附提纯氢系统技术要求

Specificationofhydrogenpurificationsystem

onpressureswingadsorption

2005-05-25发布2005-11-01实施

中华人民共和国国家质量监督检验检疫总局

中国国家标准化管理委员会发布

GB/T19773-2005

目次

前言田

范围

2规范性引用文件

3术语和定义二

4分类与命名

4.1分类

4.2产品命名

5技术要求

通用要求

:.:一般要求

5.1.2工作条件

5_2单体设备

5.2.1通用要求

5.2.2吸附器组

5.2.3真空泵机组······································································,·····,······,··········……5

5.2.4压力容器···················································································,···············……5

5.2.5氢气储罐··························································································,·····……5

5.2.6氢气压缩机···········································································,········,······,·,·……5

5.2.7氢气纯化器·······························································,··········,·······,········,·……6

5.2.8程序控制阀···························。···································································……6

52.9阻火器·························································································,·······,···……6

5.3管路及附件·······································································,·························,·……6

5.3.1材质选择··························································································,,····……6

5.3.2管道连接··············································································,·····,···········……6

5.3.3管路附件的布置······················································································……6

5.3.4氢气流速和管径·····················,····································································……7

5.3.5管道支架······························,·····························,······································……7

5.3.6冷却水管路··································,·····························································……7

5.4电气设备及配线······································,····················································……7

5.4.1氢气生产环境电气设施的设防·························································,,·············……7

5.4.2移动式变压吸附提纯氢系统················,,·······,·····························,···················……7

5.4.3电气接地·································································································……7

5.5自动控制和监测····························································································……7

5.5.1通用要求······································································,·························……7

5.5.2自控及监测装置·······,··················································································……7

5.5.3自动停车···,········,····,····,··········································································……8

5.6安装、组装·····················,················································································一8

5.6.1通用要求·····························································································,·····一·8

GB/T19773-2005

5.6.2吸附器组的安装········································,················································……8

5.6.3氢气压缩机和真空泵机组的安装····································,·····························……8

5.6.4氢气储罐的安装·················,······························。········································……8

5.6.5氢气管道、阀门及附件的安装···········································································……9

6试验与检测·····························································、········································……9

6.1试验····、····························,、·························································,,············……9

6.1.1试验前的准备··················································,··········································……9

6.1.2试验方法···································································································……9

6.2检测················、··························································································……10

6.2.1检测前的准备·········,·····················································································、…10

6.2.2性能参数检测····,·····························……10

6.2.3检测要求·····································、··················································。········……10

7标志·······················,·········,················,····················································,·······……n

7.1通用要求···················,·········································································。········……11

7.2标志牌的内容···········,·························································……·‘··········。········……11

7.3包装箱图示·······································,·························································……11

8产品随机文件···································································································……H

8.1搬运、吊装要求···································,····················,···························,········……11

8.2系统、设备图纸················,···································,·······································……11

8.3使用手册·····,························,··············,·······················································……11

8.4安装维护手册················,·······································,·······································……12

9包装········,·······,·····························································,······························……12

9.1变压吸附提纯氢系统的包装································,·············································……12

9.2压力容器的包装和运输···················································································……12

9.3充氮保护·························,···········································································……12

附录A(规范性附录)容积法测试氢气产量············,··················································……13

附录B(规范性附录)分析仪器测试氢气纯度···························································……14

表1冷却水的水质要求················································、·································…·…3

图A.1容积法测试系统示意图······················································,·,··················……13

GB/T19773-2005

月1J吕

本标准附录A、附录B为规范性附录。

本标准由全国能源基础与管理标准化技术委员会((SAC/TC20)提出并归口。

本标准由中国标准化研究院、清华大学核能与新能源技术研究院、西南化工研究设计院、中国电子

工程设计院负责起草。四川成都华西化工科技股份有限公司、上海亚联瑞兴气体技术有限公司、中船重

工集团七一八研究所、天津大陆制氢设备有限公司参加起草。

本标准主要起草人:汤洪、毛宗强、贾铁鹰、陈霖新、袁柏燕、奚树人、孟培勤、侯士杰、郭建富、

宋刚祥、吴素娟。

本标准为首次发布。

GB/T19773-2005

变压吸附提纯氢系统技术要求

范围

本标准规定了以各类含氢气体为原料,采用变压吸附法提纯氢气的制氢系统的术语和定义、分类与

命名、技术要求、试验与检测、标志、包装。

本标准适用于工业用、商业用固定式、移动式变压吸附提纯氢系统。